Home Network Design for New Builds and Renovations

Plan the Network Before the Walls Close

The network is the one system in a house that cannot be added later without cutting into finished walls, ceilings and floors. Lighting, audio and video can be revised after completion, but the cable routes, equipment rooms and access point positions are fixed at first fix, and the house lives with them for decades. We design the network first, with the architect, interior designer and contractor, so that the infrastructure is right while it is still easy to make right.

This page is for owners, architects, interior designers and main contractors planning a new build or a major renovation of a large house or estate. The equipment that eventually connects to the cabling will change many times over the life of the building. The cabling, containment and equipment rooms should not need to.

Why the Network Comes First

Every other system in a modern home depends on it: automation controllers, lighting, audio and video distribution, cameras, door entry and gates, climate and the cinema. Each of those is specified, positioned and cabled around the network. When the network is treated as an afterthought, the usual result is an equipment cupboard that is too small and too hot, no route to the garden room, access points that clash with ceiling designs, and wifi that is then patched with extenders. Planned first, the same house gets a single, tidy network core, a wired access point where every one is needed and a route to every building.

Timing matters as much as design. Moving a cable route once plaster, flooring and joinery are complete means opening finished work, while the same route at first fix is simply a matter of where the containment goes. The network also sets requirements for other trades: the equipment room needs ventilation and power, ceilings need access point positions agreed with the interior designer, and external walls need routes for the buildings beyond. Raised early these are easy to accommodate; raised late they become compromises.

What We Plan With the Design Team

Equipment rooms. The location, size, ventilation, power and access for the main equipment room and for secondary cabinets on each floor or in each building, with space for growth and for battery backup.

Cabling schedule. Category 6A to every access point, television position, desk and control point, and fibre between floors, buildings and equipment rooms where distance or bandwidth demands it, all specified, labelled and tested.

Containment and routes. Cable routes, risers, ducts and conduits, kept clear of power and coordinated with the electrical, lighting and AV design, including ducts to outbuildings, the gatehouse and the grounds.

Access point positions. Ceiling and wall positions coordinated with downlights, speakers, sprinklers and joinery, so that wireless coverage is designed into the building and the access points are visible only where we want them to be.

Internet entry. Ducts and positions for provider fibre, a second connection, and the aerials or terminals for 4G, 5G or satellite backup.

Power. The PoE budget for access points, cameras and door stations, power for the equipment rooms, and the provision of battery backup for the network core.

Cabling That Outlasts the Equipment

Category 6A cabling carries 10 gigabit Ethernet over typical in-building runs, and fibre carries far more. Wireless standards, access points and switches are replaced every few years, but the cabling inside the walls is not, and today’s access points already arrive with multi-gigabit connections that make full use of it. Installing the right cable at first fix is the difference between a network that can be upgraded by changing equipment and one that must be rebuilt.

We specify cable type, containment and termination points together: more than one cable to each access point position, spare capacity to each room for devices not yet chosen, labelled and tested terminations, and a separate, planned route for fibre between buildings. Power over Ethernet is part of the reason this matters: cabling that carries power as well as data lets access points, cameras, door stations and touch panels be placed where they are needed without a nearby socket, which is why the quality of the cable, and of the switches that feed it, counts for as much as its speed. The cabling is documented as it is installed, so that the as-built record matches the building and can be handed to the owner.

How the Process Runs

We begin with the brief and the list of systems the house will carry, then agree the equipment room strategy, cable schedule and access point plan against the architect’s drawings. Containment and cable routes are coordinated with the electrical and AV design before first fix. During the build we carry out the cabling, label and test every run, and issue as-built documentation. At second fix we install and commission the active equipment, and the network is handed over documented and, if wished, enrolled in our managed network service. Our architect and interior designer page explains how we work with design teams across a project.

Renovations and Listed Buildings

A renovation is the best opportunity a house has to be rewired for the network it will need. Where floors are up and ceilings are open we recommend wiring generously. Where the fabric is protected, as in Grade I and Grade II listed properties, cable routes must be agreed with conservation officers, and we plan discreet routes, reuse of existing ducts and, where wiring is not permitted, a hybrid design that keeps new work to the minimum needed.

In a renovation the existing house also has to keep working. Where the family or staff continue to live in part of the house, we plan the network in phases so that connectivity is maintained as walls are opened, and temporary arrangements are agreed in advance rather than improvised. We survey the existing wiring and cabinets early, since the best route for new cable is often one that already exists, and we identify what can stay, what should be replaced and what is simply no longer needed.

Estates and Multiple Buildings

Estates add distance. We plan fibre in duct between the main house, outbuildings, gatehouse and staff accommodation wherever it can be laid, and point-to-point wireless links where it cannot, with surge protection and independent power where the equipment sits outside. Each building becomes a managed part of the same network, with its own segment, and every connected system on the estate can be monitored from one place.

Between buildings the decisions are about the medium and the route. Fibre is unaffected by the electrical differences between buildings and by surges that can travel along copper, and it carries more than any wireless link, which is why we lay it wherever ducts can be installed. Ducts are specified with spare capacity and draw points so that the estate is not dug up again for the next requirement. Where a wireless link is the only option, we survey the line of sight, allow for foliage and seasonal change, and design with margin. Each building’s equipment is documented and monitored, and cameras, gates and entry systems across the estate become part of the same managed network rather than separate islands.

What We Provide for the Tender Pack

A defined network specification is also useful to the people pricing and building the project. The electrician knows what power and containment the equipment room needs, the main contractor knows which cabling is to be run and where it terminates, and the interior designer sees the ceiling and wall positions of access points and can resolve them early. We can attend design team meetings where needed and review drawings as they develop, so that changes by others are picked up before they affect the network, and at handover the installed network is tested and documented against the design.

For architects and contractors we can provide the network section of the specification: equipment room layouts and requirements, a cable schedule, access point plans, containment and duct requirements and the electrical needs of the network, so that the work is priced and built once, correctly. To discuss a project, get in touch, ideally before the first-fix design is fixed.

Home Wi-Fi and Networking → · For Architects and Designers → · Discuss a project →

Network Design FAQs

  • When should we involve a network specialist in a new build?
    As early as the first-fix design, and ideally at concept stage, when equipment rooms and routes can still be placed without compromise. Late involvement usually means a cupboard that is too small and cable routes that have to be forced through finished work.
  • What cabling should a large house have?
    Category 6A to every access point, television position, desk and control point, with fibre between floors, buildings and equipment rooms where distance or bandwidth demands it. The exact schedule is drawn up from the brief and the drawings for each house.
  • How do you decide where the access points go?
    From the building construction and layout, planned on the drawings and then verified on site. Positions are coordinated with ceiling and lighting design so that coverage is even and the access points sit where they belong visually.
  • Can our electrician install the cabling?
    Cabling for a network of this kind is specified, labelled and tested as a system, so we carry it out ourselves and are accountable for the result. We coordinate closely with the electrician and the main contractor on containment, routes and power.
  • Is a wired network still necessary with the latest wifi standards?
    Yes. Newer wifi standards make wired access points more valuable, not less, because every access point needs a fast, reliable connection to the network. Cabling at first fix is the foundation that lets those access points perform.
  • Can you work from our architect’s drawings?
    Yes. We work from the architect’s plans and sections, mark up equipment rooms, routes and access point positions, and coordinate changes with the design team as the drawings develop.
  • Can you connect outbuildings, a gatehouse and grounds?
    Yes. We plan fibre in duct where it can be laid and point-to-point wireless links where it cannot, with each building on its own segment of the same network, and coverage in the grounds where it is needed.